Ruskin Manufacturing

Ruskin Manufacturing, a renowned leader in the industry, enlisted the expertise of A.L. Huber for a significant expansion project to enhance their testing and engineering capabilities. With a focus on innovation and efficiency, A.L. Huber began constructing a 10,000 sq. ft. pre-engineered metal building addition within Ruskin’s existing facility. Despite the challenges posed by the need to maintain operations in the occupied lab space, our team seamlessly executed the project, ensuring minimal disruption to Ruskin’s daily activities. The scope of work also encompassed the installation of a new loading dock and 400 ln. ft. of cast-in-place retaining walls, meticulously tailored to meet Ruskin’s specific requirements and objectives.

Throughout the project, A.L. Huber’s close collaboration with Ruskin Manufacturing was integral to its success. From the initial planning stages to the final execution, our team worked diligently to align every aspect of the renovation with Ruskin’s vision and operational needs. The result is a state-of-the-art facility that expands Ruskin’s testing and engineering capabilities and provides a flexible and adaptable space for future growth and innovation. This project exemplifies our commitment to delivering tailored solutions that support our client’s success and foster long-term partnerships built on trust and collaboration.

Project Features:

  • Pre-engineered metal building
  • Safety & logistics for occupied campus

Let us know if you have an upcoming renovation or construction project!