TransAm Trucking’s new office building is down the street from their truck operations site. This striking new two-story building features concrete exterior wall panels, a geothermal mechanical system—36×500’ geothermal well—a raised computer floor throughout the building, and a beautiful glass and sheet metal exterior. The quality and craftsmanship inside were second to none, including art installations and a graphics mural on the interior glass. The Owner was exceptionally pleased with the A.L. Huber team’s level of performance, attention to detail, and communication.
Project Features:
- Extensive preconstruction services
- Sustainable design & construction
- New build construction
- Art installation coordination